TY - DATA AB - Well 58-32 (previously labeled MU-ESW1) was drilled near Milford Utah during Phase 2B of the FORGE Project to confirm geothermal reservoir characteristics met requirements for the final FORGE site. Well Accord-1 was drilled decades ago for geothermal exploration purposes. While the conditions encountered in the well were not suitable for developing a conventional hydrothermal system, the information obtained suggested the region may be suitable for an enhanced geothermal system. Geophysical well logs were collected in both wells to obtain useful information regarding there nature of the subsurface materials. For the recent testing of 58-32, the Utah FORGE Project contracted with the well services company Schlumberger to collect the well logs. AU - Podgorney, Robert AU - McLennan, John AU - Moore, Joe AU - Simmons, Stuart AU - Wannamaker, Phil AU - Allis, Rick AU - Jones, Clay DB - Geothermal Data Repository DP - Open EI | National Renewable Energy Laboratory DO - 10.15121/1495406 KW - geothermal KW - energy KW - FORGE KW - student competition KW - 58-32 KW - accord-1 KW - EGS KW - Roosevelt Hot Springs KW - Milford KW - Utah KW - reservoir characteristics KW - well log KW - geophysical KW - geophysics KW - lithology KW - thermal conductivity KW - x-ray diffraction KW - well survey KW - sonic KW - well locations KW - density KW - caliper KW - hole diameter KW - gamma KW - GR KW - radiation KW - resistivity KW - neutron KW - porosity KW - SP KW - temperature KW - conductivity KW - specific potential KW - MU-ESW1 KW - well KW - data KW - well data KW - resource KW - characterization KW - exploration KW - Utah FORGE LA - English DA - 2018/12/07 PY - 2018 PB - Idaho National Laboratory T1 - Utah FORGE: Well Data for Student Competition UR - https://doi.org/10.15121/1495406 ER -