58-32_OpenHoleStimulation.xlsx Software Microsoft Excel for Office 365 Dates of Data Collection: April 21, 2019 - April 24, 2019 Origin: Extracted from the Pason surface instruments to isolate pumping cycles for open hole stimulation, clipped to isolate pumping and flowback by GRG - contact at www.geothermalresourcegroup.com Time Zone: MDT (Mountain Daylight Time)=UTC-6 (time not synchornized across tools/data) Dates: month/day/year unless otherwise indicated Description: 11 worksheets Summary: text describing pumping cycles Cycle 1: 4/21/19 6:53 - 4/21/19 11:19 Graph: Open Hole Cycle 1 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 2: 4/21/19 11:19 - 4/21/19 12:28 Graph: Open Hole Cycle 2 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 3: 4/21/19 12:18 - 4/21/19 13:40 Graph: Lower perfs Cycle 3 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 4: 4/21/19 13:40 - 4/22/19 10:59 Graph: Open hole Cycle 4 pumping detail Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate Graph: Open hole Cycle 4 and bleed off Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 5: 4/22/19 11:01 - 4/22/19 12:44 Graph: Open hole Cycle 5 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate Flowback Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 6: 4/22/19 12:44 - 4/22/19 16:56 Graph: Open hole Cycle 6 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 7: 4/22/19 16:56 - 4/23/19 12:17 Graph: Lower perfs Cycle 7 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 8: 4/23/19 12:34 - 4/23/19 15:46 Graph: Lower perfs Cycle 8 Left scale Pressure (psi) vs time (hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs time (hours, mins, secs) Pump Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [Pump 2 Rate (gpm)=weatherford pump rate], [Total Pump Rate (gpm)], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. Cycle 9:4/23/19 15:46 - 4/24/19 11:14 Graph: Open hole Cycle 9 Left scale Pressure (psi) vs date and time (days, hours, mins, secs) Tubing Pressure Casing pressure Right scale Flow (gpm)vs date and time (days, hours, mins, secs) Pump Rate Flowback Rate [SPP (psi)=Stand Pipe Pressure, tubing pressure], [Casing (psi)=casing pressure, aanulus between tubing and 7" casing], [CASING 2 (psi)=duplicate casing pressure], [Pump 3 Rate (gpm)=weatherford pump rate], [Pump 2 Rate (gpm)=weatherford pump rate], [Total Pump Rate (gpm)], [(Flowback Rate (gpm)=Pump #1 in pason-flowmeter on choke line], [(Tank 1 (bbl)=mud pit level-combine with Tank 2 for total volume in pits], [(Tank 2 (bbl))=mud pit level-combine with Tank 1 for total volume in pits], [(TEMP IN (F)=Probe location in barrel next to mud pit-consider ambient], [TEMP OUT (F)=In far end rig mud pit]. DownholePT: 4/20/19 8:13-4/22/19 21:53 Downhole pressure(psi) and temperature (°F) measurements during cycle 1, text with notes