UU_MU_ESW1_DAILIES.xlsx Software Miccrosoft Excel for Office 365 Dates of Data Collection: April 18, 2019 - May 4, 2019 Origin: Summary of daily activities at 30 minute intervals perpared by DiDrill Servey Services Time Zone: MDT (Mountain Daylight Time)=UTC-6 (note that times are not synchronized across tools) Description: 17 worksheets Daily: April 18, 2019, prepare and transport equipment to site Daily (2): April 19, 2019, standby Daily (3): April 20, 2019, hydro test tubing from 2850' to 5240' Daily (4): April 21, 2019, cycle 1, 2 and 3, pressure info Daily (5): April 22, 2019, cycle 4, 5, 6 and 7, pressure info Daily (6): April 23, 2019, bleed back, cycle 8 and 9, pressure info Daily (7): April 24, 2019, send memory tool surveys to DDSS facility for Annotation Daily (8): April 25, 2019, replace Pason, RIH with bridge plug, trip out of hole Daily (9): April 26, 2019, standby, service and test tool Daily (10): April 27, 2019, flowback, cylce 5, 6, 7 and 8 Daily (11): April 28, 2019, cycle 8 and 8, trip out of hole with packerRIH with bridge plug retreival, rig up surface pump latch onto bridge plug Daily (12): April 29, 2019, trip out of hole, rig up/down wireline, BATTERIES PLUGGED into PT MEmeory Tool, trip in hole set packer, trip out of hole Daily (13): April 30, 2019, Pick up BHA, RIH with BHA, pressure test surface equipment, cycle 1, 2, 3, and 4, POOH with tubing and gauges Daily (14): May 1, 2019, PIH with weatherford HD retrievable packer, tubing flow well, cycle 7 Daily (15): May 2, 2019, cycle 8, open choke, cyle 9, rig down, bleed off, POOH, TOOL OUT OF HOLE, BATTERY UNPLUGGED, send toool to DDSS facility for Annotation, Daily (16): May 3, 2019, bleed off, POOH, TOOL OUT OF HOLE, BATTERY UNPLUGGED, send toool to DDSS facility for Annotation, Daily (17): May 4, 2019, transport to facility