11:56 AM
collabplotter (to All):

Jeff ... looks like you're starting a new log file? If so, don't forget to change the name in File_to_plot.


12:01 PM
To All:

PNNL08 Production Pressure; SNL08 Production Packer Pressure, SNL07 Injection Packer Pressure


12:11 PM
To All:

SNL04 E1-I Pressure


12:17 PM
To All:

Correction - SNL06 E1-I Pressure


12:19 PM
To Jeff Burghardt (PRIVATE):

I've muted you for the compressor noise.


12:20 PM
Jeff Burghardt (to All):

We valved out the production packers. If needed we can repressurize them with the ISCO


12:39 PM
To All:

Do we have a leak in the packer in E1-I?


12:45 PM
Tim Kneafsey (to All):

It is possible. The leak in the E1-P packer of ~0.05 mL/min was equivalent to 50 psi/min rate.


12:47 PM
Jeff Burghardt (to All):

We see pressure declines like this in most of the packers most of the time


12:55 PM
Tim Kneafsey (to All):

Please back of to 10 ml/min


12:58 PM
Martin Schoenball (to All):

The OT hydrophones look quite, no flow noise as in the stims


1:06 PM
Tim Kneafsey (to All):

Leak in a panel noted


1:06 PM
To All:

Leak noted on one of the panels. Leak from the injection line.


1:11 PM
Tim Kneafsey (to All):

Leak fixed in Panel 4


1:14 PM
Tim Kneafsey (to All):

Estimated volume of void in E1-P packer is ~ 5L. To be verified!