Search GDR Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Topic
Technologies
Demonstration Sites
Data Type
The purpose of phase 1 is to determine the feasibility of integrating geologic CO2 storage (GCS) with geothermal energy production. Phase 1 includes reservoir analyses to determine injector/producer well schemes that balance the generation of economically useful flow rates at the ...
Active Management of Integrated Geothermal-CO2 Storage Reservoirs in Sedimentary Formations: An Approach to Improve Energy Recovery and Mitigate Risk : FY1 Final Report
The purpose of phase 1 is to determine the feasibility of integrating geologic CO2 storage (GCS) with geothermal...
Active Management of Integrated Geothermal-CO2 Storage Reservoirs in Sedimentary Formations: An Approach to Improve Energy Recovery and Mitigate Risk : FY1 Final Report
The purpose of phase 1 is to determine the feasibility of integrating geologic CO2 storage (GCS) with geothermal...
Active Management of Integrated Geothermal-CO2 Storage Reservoirs in Sedimentary Formations: An Approach to Improve Energy Recovery and Mitigate Risk: FY1 Final Report
The purpose of phase 1 is to determine the feasibility of integrating geologic CO2 storage (GCS) with geothermal...
Geothermal power plants typically show decreasing heat and power production rates over time. Mitigation strategies include optimizing the management of existing wells increasing or decreasing the fluid flow rates across the wells and drilling new wells at appropriate locations. Th...
Google Map