Search GDR Data
Showing results 1 - 2 of 2.
Show
results per page.
Order by:
Available Now:
Topic
Technologies
Demonstration Sites
Data Type
The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to April 28th, 2024. They discuss the activity on the rig each day, with each report containing information on...
This is the annual report for Utah FORGE Phase 3A, year two, which was published on July 28th, 2022. The report includes site infrastructure, site operations, seismic monitoring reports, FORGE modeling reports, and external research and design. The ultimate objective of Utah FORGE...
Google Map