Search GDR Data
Showing results 1 - 2 of 2.
Show
results per page.
Order by:
Available Now:
Technologies
Featured Projects
Topics
Data Type
University of Illinois Campus Deep Direct-Use Feasibility Study Design of Injection Well #1 (CCS1)
Includes specification sheet, wellbore geometry, and drilling fluids at section target depth associated with the design of Injection Well #1 (CCS1) for the Illinois Basin Decatur Project (IBDP).
Greenberg, S. University of Illinois
Mar 30, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Newberry EGS Demonstration: Well 55-29 Stimulation Data 2014
The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to ru...
Cladhouhos, T. et al AltaRock Energy Inc
Sep 03, 2015
54 Resources
0 Stars
Curated
54 Resources
0 Stars
Curated