NREL and the Colorado School of Mines (SURGE) conducted research in FY14 to identify petroleum drilling and completion practices (methods and technologies) that can be transferred to geothermal drilling and completion, to provide the geothermal industry with more effective, lower ...
The objectives of this project were to (1) perform a literature review of sedimentary geothermal resources, (2) identify data sources and develop data-collection methodologies that characterize selected resources, (3) screen sedimentary basins and formations for sedimentary geothe...
The large scale Deep Direct Use (DDU) geothermal project in the low temperature environment of the Illinois Basin requires drilling and completing two wells. One well would be the extraction (producing) well and would be built to deliver a flow rate of approximately 6000 barrels ...
The objective of advanced drilling and logging technologies is to promote ways and means to reduce the cost of geothermal drilling through an integrated effort which involves developing an understanding of geothermal drilling and logging needs, elucidating best practices, and fost...
This submission includes the final project report of the Snake River Plain Play Fairway Analysis project as well as a separate appendix for the final report. The final report outlines the application of Play Fairway Analysis (PFA) to geothermal exploration, specifically within the...
This data set includes sidewall core data from well Cornell ESH #1 (API 31109300030000), known as the Cornell University Borehole Observatory, or CUBO. It is a stratigraphic well drilled to characterize potential EGS resources. The Drilling commenced on June 21, 2022 and total dep...
This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule.
Rig move in began 10/22/2020 and dril...
Bottom hole assembly (BHA) designs were assessed in field trials for their ability to achieve critical low inclination requirements, while simultaneously enabling high drill rates. Because angle has historically been controlled by reducing weight on bit (WOB), these are often com...