Utah FORGE: 58-32 Injection and Packer Performance, April and May 2019

Publicly accessible License 

This is a PDF format summary report regarding the performance of a packer, which failed, and bridge plug used during the injection program in Utah FORGE deep Well 58-32, April and May, 2019.

Citation Formats

Energy and Geoscience Institute at the University of Utah. (2020). Utah FORGE: 58-32 Injection and Packer Performance, April and May 2019 [data set]. Retrieved from https://gdr.openei.org/submissions/1210.
Export Citation to RIS
McLennan, John, Podgorney, Rob. Utah FORGE: 58-32 Injection and Packer Performance, April and May 2019. United States: N.p., 22 Mar, 2020. Web. https://gdr.openei.org/submissions/1210.
McLennan, John, Podgorney, Rob. Utah FORGE: 58-32 Injection and Packer Performance, April and May 2019. United States. https://gdr.openei.org/submissions/1210
McLennan, John, Podgorney, Rob. 2020. "Utah FORGE: 58-32 Injection and Packer Performance, April and May 2019". United States. https://gdr.openei.org/submissions/1210.
@div{oedi_1210, title = {Utah FORGE: 58-32 Injection and Packer Performance, April and May 2019}, author = {McLennan, John, Podgorney, Rob.}, abstractNote = {This is a PDF format summary report regarding the performance of a packer, which failed, and bridge plug used during the injection program in Utah FORGE deep Well 58-32, April and May, 2019.}, doi = {}, url = {https://gdr.openei.org/submissions/1210}, journal = {}, number = , volume = , place = {United States}, year = {2020}, month = {03}}

Details

Data from Mar 22, 2020

Last updated Apr 13, 2021

Submitted Mar 25, 2020

Organization

Energy and Geoscience Institute at the University of Utah

Contact

John McLennan

801.587.7925

Authors

John McLennan

Energy and Geoscience Institute at the University of Utah

Rob Podgorney

Idaho National Laboratory

DOE Project Details

Project Name Utah FORGE

Project Lead Lauren Boyd

Project Number EE0007080