Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores - Pipe Preparation Report
The main goal of this project is to develop an annular isolation system capable to withstand geothermal downhole conditions and mitigate the problems experienced by conventional packers in FORGE wells. This pipe preparation report is based on the test pipe that was procured and prepared to perform the full scale test of the geothermal annular barriers that were developed in the project, and takes place in the small-scale experiments phase of the project.
Citation Formats
Welltec. (2023). Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores - Pipe Preparation Report [data set]. Retrieved from https://gdr.openei.org/submissions/1506.
Teodoriu, Catalin, Vasques, Ricardo, Esquitin, Yosafat, Hallundbaek, Soren, and Melander, Ryan. Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores - Pipe Preparation Report . United States: N.p., 31 Mar, 2023. Web. https://gdr.openei.org/submissions/1506.
Teodoriu, Catalin, Vasques, Ricardo, Esquitin, Yosafat, Hallundbaek, Soren, & Melander, Ryan. Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores - Pipe Preparation Report . United States. https://gdr.openei.org/submissions/1506
Teodoriu, Catalin, Vasques, Ricardo, Esquitin, Yosafat, Hallundbaek, Soren, and Melander, Ryan. 2023. "Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores - Pipe Preparation Report ". United States. https://gdr.openei.org/submissions/1506.
@div{oedi_1506, title = {Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores - Pipe Preparation Report }, author = {Teodoriu, Catalin, Vasques, Ricardo, Esquitin, Yosafat, Hallundbaek, Soren, and Melander, Ryan.}, abstractNote = {The main goal of this project is to develop an annular isolation system capable to withstand geothermal downhole conditions and mitigate the problems experienced by conventional packers in FORGE wells. This pipe preparation report is based on the test pipe that was procured and prepared to perform the full scale test of the geothermal annular barriers that were developed in the project, and takes place in the small-scale experiments phase of the project.}, doi = {}, url = {https://gdr.openei.org/submissions/1506}, journal = {}, number = , volume = , place = {United States}, year = {2023}, month = {03}}
Details
Data from Mar 31, 2023
Last updated Aug 17, 2023
Submitted Jun 22, 2023
Organization
Welltec
Contact
Ricardo Vasques
281.840.1834
Authors
Keywords
geothermal, energy, wellbore, casing, drilling, technical, assessment, stimulation, FORGE, EGSDOE Project Details
Project Name Development of a Smart Completion & Stimulation Solution
Project Lead Angel Nieto
Project Number EE0007080