Utah FORGE: Neubrex Well 16B(78)-32 Cementing and Circulation Fiber Optics Monitoring Reports - July, 2023

Publicly accessible License 

Included here are two fiber optics monitoring reports on Utah FORGE well 16B(78)-32 from Neubrex Energy Services. These reports review the fiber optics monitoring during both the cementing and circulation test periods of the well. Cementing as well as post-cementing monitoring and circulation testing occurred from July 13th to July 20th of 2023. Reports detail the data collection process and provide relevant findings in a presentation format. Well 16B(78)-32 serves as the production well for the Utah FORGE enhanced geothermal system (EGS).

Citation Formats

Neubrex Energy Services (US), LLC. (2023). Utah FORGE: Neubrex Well 16B(78)-32 Cementing and Circulation Fiber Optics Monitoring Reports - July, 2023 [data set]. Retrieved from https://gdr.openei.org/submissions/1559.
Export Citation to RIS
Jurick, Dana, Guzik, Dr. Artur, Kishida, Dr. Kinzo, and Fishback, Wayne. Utah FORGE: Neubrex Well 16B(78)-32 Cementing and Circulation Fiber Optics Monitoring Reports - July, 2023. United States: N.p., 21 Oct, 2023. Web. https://gdr.openei.org/submissions/1559.
Jurick, Dana, Guzik, Dr. Artur, Kishida, Dr. Kinzo, & Fishback, Wayne. Utah FORGE: Neubrex Well 16B(78)-32 Cementing and Circulation Fiber Optics Monitoring Reports - July, 2023. United States. https://gdr.openei.org/submissions/1559
Jurick, Dana, Guzik, Dr. Artur, Kishida, Dr. Kinzo, and Fishback, Wayne. 2023. "Utah FORGE: Neubrex Well 16B(78)-32 Cementing and Circulation Fiber Optics Monitoring Reports - July, 2023". United States. https://gdr.openei.org/submissions/1559.
@div{oedi_1559, title = {Utah FORGE: Neubrex Well 16B(78)-32 Cementing and Circulation Fiber Optics Monitoring Reports - July, 2023}, author = {Jurick, Dana, Guzik, Dr. Artur, Kishida, Dr. Kinzo, and Fishback, Wayne.}, abstractNote = {Included here are two fiber optics monitoring reports on Utah FORGE well 16B(78)-32 from Neubrex Energy Services. These reports review the fiber optics monitoring during both the cementing and circulation test periods of the well. Cementing as well as post-cementing monitoring and circulation testing occurred from July 13th to July 20th of 2023. Reports detail the data collection process and provide relevant findings in a presentation format. Well 16B(78)-32 serves as the production well for the Utah FORGE enhanced geothermal system (EGS).}, doi = {}, url = {https://gdr.openei.org/submissions/1559}, journal = {}, number = , volume = , place = {United States}, year = {2023}, month = {10}}

Details

Data from Oct 21, 2023

Last updated Nov 1, 2024

Submitted Oct 22, 2023

Organization

Neubrex Energy Services (US), LLC

Contact

Dana Jurick

713.899.1545

Authors

Dana Jurick

Neubrex Energy Services US LLC

Dr. Artur Guzik

Neubrex Energy Services US LLC

Dr. Kinzo Kishida

Neubrex Energy Services US LLC

Wayne Fishback

Neubrex Energy Services US LLC

DOE Project Details

Project Name Utah FORGE

Project Lead Lauren Boyd

Project Number EE0007080

Share

Submission Downloads