Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011
This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.
Citation Formats
AltaRock Energy Inc. (2024). Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011 [data set]. Retrieved from https://gdr.openei.org/submissions/1599.
Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, and Sonnenthal, Eric. Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. United States: N.p., 05 May, 2024. Web. https://gdr.openei.org/submissions/1599.
Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, & Sonnenthal, Eric. Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. United States. https://gdr.openei.org/submissions/1599
Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, and Sonnenthal, Eric. 2024. "Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011". United States. https://gdr.openei.org/submissions/1599.
@div{oedi_1599, title = {Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011}, author = {Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, and Sonnenthal, Eric.}, abstractNote = {This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.}, doi = {}, url = {https://gdr.openei.org/submissions/1599}, journal = {}, number = , volume = , place = {United States}, year = {2024}, month = {05}}
Details
Data from May 5, 2024
Last updated Jul 9, 2024
Submitted May 5, 2024
Organization
AltaRock Energy Inc
Contact
Trenton Cladouhos
206.605.1948
Authors
Keywords
geothermal, energy, newberry, EGS, demonstration, volcano, AltaRock, Oregon, geology, geologic model, conceptual resource model, seismicity, induced seismicity, mitigation, maximum magnitude, in situ stress, permitting, stimulation, reservoir characterization, drilling plan, well testing, risk mitigation, reportingDOE Project Details
Project Name Newberry EGS Demonstration
Project Lead Lauren Boyd
Project Number EE0002777