Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011

Publicly accessible License 

This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.

Citation Formats

AltaRock Energy Inc. (2024). Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011 [data set]. Retrieved from https://gdr.openei.org/submissions/1599.
Export Citation to RIS
Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, and Sonnenthal, Eric. Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. United States: N.p., 05 May, 2024. Web. https://gdr.openei.org/submissions/1599.
Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, & Sonnenthal, Eric. Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. United States. https://gdr.openei.org/submissions/1599
Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, and Sonnenthal, Eric. 2024. "Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011". United States. https://gdr.openei.org/submissions/1599.
@div{oedi_1599, title = {Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011}, author = {Cladouhos, Trenton, Petty, Susan, Iovenitti, Joe, Callahan, Owen, Osborn, William, Nofziger, Laura, and Sonnenthal, Eric.}, abstractNote = {This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.}, doi = {}, url = {https://gdr.openei.org/submissions/1599}, journal = {}, number = , volume = , place = {United States}, year = {2024}, month = {05}}

Details

Data from May 5, 2024

Last updated Jul 9, 2024

Submitted May 5, 2024

Organization

AltaRock Energy Inc

Contact

Trenton Cladouhos

206.605.1948

Authors

Trenton Cladouhos

AltaRock Energy

Susan Petty

AltaRock Energy

Joe Iovenitti

AltaRock Energy

Owen Callahan

AltaRock Energy

William Osborn

AltaRock Energy

Laura Nofziger

AltaRock Energy

Eric Sonnenthal

Lawrence Berkeley National Laboratory

DOE Project Details

Project Name Newberry EGS Demonstration

Project Lead Lauren Boyd

Project Number EE0002777

Share