Search GDR Data
Showing results 1 - 3 of 3.
Show
results per page.
Order by:
Available Now:
Technologies
Featured Projects
Topics
Data Type
Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011
This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communica...
Cladouhos, T. et al AltaRock Energy Inc
May 05, 2024
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
Newberry EGS Demonstration: Well 55-29 Stimulation Data 2014
The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to ru...
Cladhouhos, T. et al AltaRock Energy Inc
Sep 03, 2015
54 Resources
0 Stars
Curated
54 Resources
0 Stars
Curated
Newberry EGS Demonstration: Well 55-29 Stimulation Data
The Newberry Volcano EGS Demonstration in central Oregon, a 3 year project started in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to ...
T., T. AltaRock Energy Inc
Dec 08, 2012
136 Resources
0 Stars
Curated
136 Resources
0 Stars
Curated