Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report

Publicly accessible License 

This is an installation report detailing placement of the integrated fiber-optic cable behind casing in Utah FORGE well 16B(78)-32. These activities occurred in July of 2023 immediately after the drilling of 16B. This report was prepared by the FOGMORE R&D project (Fiber Optic MOnitoring for Reservoir Evolution), Utah FORGE R&D Project 3-2417. For clarity, several cables were installed behind casing in well 16B. This report only documents the cable installed by the FOGMORE Utah FORGE project. A second cable was installed by a team led by UT Austin and Shell.

Citation Formats

Rice University. (2024). Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report [data set]. Retrieved from https://gdr.openei.org/submissions/1603.
Export Citation to RIS
Ajo-Franklin, Jonathan, Broman, Benjamin, and Derosier, Matt. Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report. United States: N.p., 15 May, 2024. Web. https://gdr.openei.org/submissions/1603.
Ajo-Franklin, Jonathan, Broman, Benjamin, & Derosier, Matt. Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report. United States. https://gdr.openei.org/submissions/1603
Ajo-Franklin, Jonathan, Broman, Benjamin, and Derosier, Matt. 2024. "Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report". United States. https://gdr.openei.org/submissions/1603.
@div{oedi_1603, title = {Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report}, author = {Ajo-Franklin, Jonathan, Broman, Benjamin, and Derosier, Matt.}, abstractNote = {This is an installation report detailing placement of the integrated fiber-optic cable behind casing in Utah FORGE well 16B(78)-32. These activities occurred in July of 2023 immediately after the drilling of 16B. This report was prepared by the FOGMORE R&D project (Fiber Optic MOnitoring for Reservoir Evolution), Utah FORGE R&D Project 3-2417. For clarity, several cables were installed behind casing in well 16B. This report only documents the cable installed by the FOGMORE Utah FORGE project. A second cable was installed by a team led by UT Austin and Shell. }, doi = {}, url = {https://gdr.openei.org/submissions/1603}, journal = {}, number = , volume = , place = {United States}, year = {2024}, month = {05}}

Details

Data from May 15, 2024

Last updated May 21, 2024

Submitted May 15, 2024

Organization

Rice University

Contact

Jonathan Ajo-Franklin

510.735.4350

Authors

Jonathan Ajo-Franklin

Rice University

Benjamin Broman

Silixa LLC

Matt Derosier

Silixa LLC

DOE Project Details

Project Name Utah FORGE

Project Lead Lauren Boyd

Project Number EE0007080

Share

Submission Downloads