Search GDR Data
Showing results 1 - 25 of 64.
Show
results per page.
Order by:
Available Now:
Topic
Technologies
Demonstration Sites
Data Type
This report examines improvements to the representation of geothermal resources and technologies, including hydrothermal, near-field, and deep enhanced geothermal systems (EGS), in EPRI's US-REGEN capacity expansion model. Using updated datasets from the National Renewable Energy ...
Submitted data include simulations related to underground thermal battery (UTB) simulations described in Modeling and efficiency study of large scale underground thermal battery deployment, presented at GRC, October 2021.
The UTB is comprised of a tank of water, a helical heat ex...
Operational performance requirements are needed to support development of specifications for downhole motor power sections to be used for drilling hard rock during geothermal wellbore construction. Theoretical torque specifications are derived based upon a widely-accepted rock-re...
This submission includes input and results data from analysis done as part of the Geothermal Technology Office's Geothermal Vision Study (GeoVision). The submission includes data for both analysis of the electricity sector and the heating and cooling sector. For the electricity se...
Using laboratory slide-hold-slide experiments, at temperatures from 22 to 200 degrees C, to examine effects of fracture reactivation and quasi-static loading on the evolution of fluid transport properties of simulated fractures in Westerly granite. At all temperatures, the in-plan...
The National Renewable Energy Laboratory (NREL) was tasked with developing a metric in 2012 to measure the impacts of RD&D funding on the cost and time required for geothermal exploration activities. The development of this cost and time metric included collecting cost and time da...
In this study, we have undertaken a robust analysis of the global supply chain and manufacturing costs for components of Organic Rankine Cycle (ORC) Turboexpander and steam turbines used in geothermal power plants. We collected a range of market data influencing manufacturing from...
This spreadsheet allows the user to calculate parameters relevant to techno-economic performance of a two-step absorption process to transport low temperature geothermal heat some distance (1-20 miles) for use in building air conditioning. The parameters included are (1) energy de...
The objective of advanced drilling and logging technologies is to promote ways and means to reduce the cost of geothermal drilling through an integrated effort which involves developing an understanding of geothermal drilling and logging needs, elucidating best practices, and fost...
This file was a report submitted to GTO by Mark Paster, a consultant to the GETEM project, to outline the improvements that were made between summer 2011 and spring 2013. The report focuses on six areas of model improvement:
(1) Site Specific Cost Variability;
(2) Consistency wi...
The submitted dataset was generated by a series of laboratory fracture clogging (permeability reduction) experiments using commercially available materials used for lost circulation management during geothermal well drilling. The experiments were conducted using a permeability plu...
The McGee Mountain geothermal area was selected to test early-stage shallow temperature survey techniques and drill two slim holes to test the resource. Geothermal Technical Partners, Inc. was able to complete only a small portion of the project before lack of funding prevented f...
This submission includes a presentation and paper for the Geothermal Resources Council (GRC) that discuss:
Federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees for the Bureau of Land Management (BLM) a...
Substantial unexploited opportunity exists for the US, and the world, in Enhanced Geothermal Systems (EGS). This cost analysis study provides a baseline cost for a 50 MW Geothermal Power Plant in a challenging New England environment. The study then assesses how project costs wo...
The U.S. Department of Energy Geothermal Vision (GeoVision) Study is currently looking at the potential to increase geothermal deployment in the U.S. and to understand the impact of this increased deployment. This paper reviews 31 performance, cost, and financial parameters as inp...
This dataset provides information gathered to determine end use load and assessment of existing district heating systems (DHS). It also provides Aspen simulation files used to model hybrid natural gas geothermal district heating and cooling (GDHC) system along with Exchange Design...
Preliminary monitoring and analyses for the Utah FORGE Milford Site.
Includes a report detailing the seismic monitoring goals and results, a detailed techno-economic infrastructure assessment with an analysis, a budget, schedules, and cost summaries, and a summary of environmental...
Using an ultra-light aircraft, a high-resolution aeromagnetic survey was carried out over Ormat Nevada's Glass Buttes project area in Oregon. Survey operations were completed on May 25, 2010.
Average terrain clearance was 223 meters from the sensor. A total of 1,352 line-miles o...
This data packet contains supply curves and a composite siting exclusion TIFF for EGS and hydrothermal geothermal across the contiguous United States. The supply curves offer comprehensive metrics such as capacity (MW), generation (MWh), levelized cost of energy (LCOE), levelized ...
The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmenta...
NREL and the Colorado School of Mines (SURGE) conducted research in FY14 to identify petroleum drilling and completion practices (methods and technologies) that can be transferred to geothermal drilling and completion, to provide the geothermal industry with more effective, lower ...
In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include...
We conducted a comprehensive analysis of the structural controls of geothermal systems within the Great Basin and adjacent regions. Our main objectives were to:
1) Produce a catalogue of favorable structural environments and models for geothermal systems.
2) Improve site-specifi...
This submission includes an Electricity Generation Summary, Maintenance Logs, Detailed Operations Data, Operating Cost Summary, and an Operations overview at the Paisley Oregon Geothermal Plant.
Data uploaded for SVEC by Tom Williams, NREL
According to the Energy Information Administration (EIA) of the U.S. Department of Energy (DOE), geothermal energy generation in the United States is projected to more than triple by 2040 (EIA 2013). This addition, which translates to more than 5 GW of generation capacity, is anti...
Google Map