Search GDR Data
Showing results 1 - 11 of 11.
Show
results per page.
Order by:
Available Now:
Technologies
Featured Projects
Topics
Data Type
Salton Sea Geothermal Development Nontechnical Barriers to Entry Analysis and Perspectives
The report included in this submission details the nontechnical barriers to entry for development of geothermal resources in the Salton Sea. The Salton Sea provides an economically viable opportunity for replacing the energy imported by California which makes up 25 percent of Cali...
Goodman, D. et al Pacific Northwest National Laboratory
Jun 28, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
GeoVision Barriers Taskforce
This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort.
Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included i...
Young, K. and Levine, A. National Renewable Energy Laboratory
Sep 30, 2015
5 Resources
0 Stars
Curated
5 Resources
0 Stars
Curated
NTB (Non-technical Barriers) Interviews with Geothermal Stakeholders for Geothermal Development in the Salton Sea.
Non-technical barriers to deploying geothermal electricity projects in the United States can create significant delays and other challenges, leading to higher project risk and costs, lost opportunities to access policy incentives, and ultimately decreased competitiveness against o...
Levine, A. and Smith, L. National Renewable Energy Laboratory
Oct 01, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Economic Impact of Permitting Timelines on Produced Geothermal Power
Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the n...
Neupane, G. and Adhikari, B. Idaho National Laboratory
Feb 15, 2022
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Geothermal Project Database Supporting Barriers and Viability Analysis for Development by 2020 Timeline
This data provides the underlying project-level analysis and data sources complied in response to the DOE request to determine the amount of geothermal capacity that could be available to meet the President's request to double renewable energy capacity by 2020.
The enclosed dat...
Wall, A. and Young, K. National Renewable Energy Laboratory
Oct 21, 2014
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada
In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include...
Levine, A. et al National Renewable Energy Laboratory
Mar 10, 2022
19 Resources
0 Stars
Publicly accessible
19 Resources
0 Stars
Publicly accessible
Update on Geothermal Direct-Use Installations in the United States
An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of direct-use applications examined include hot springs resorts and pools, aquaculture...
Beckers, K. et al National Renewable Energy Laboratory
Mar 02, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores Pipe Preparation Report
The main goal of this project is to develop an annular isolation system capable to withstand geothermal downhole conditions and mitigate the problems experienced by conventional packers in FORGE wells. This pipe preparation report is based on the test pipe that was procured and pr...
Teodoriu, C. et al Welltec
Mar 31, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS
EGS field projects have not sustained production at rates greater than 1/2 of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igneo...
A., C. Pacific Northwest National Laboratory
Sep 15, 2014
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Utah FORGE 1-2551: Multi-Stage Fracturing System and Well Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores Workshop Presentation and Report
Included here are a presentation recording, slides, and report on the Multi-Stage Fracturing System and Well Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores project by Colorado School of Mines, presented by Dr. William W. Fleckenstei...
Fleckenstein, W. et al Colorado School of Mines
Sep 08, 2023
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS
EGS field projects have not sustained production at rates greater than half of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igne...
A., C. Pacific Northwest National Laboratory
Sep 25, 2013
19 Resources
0 Stars
Publicly accessible
19 Resources
0 Stars
Publicly accessible