Search GDR Data
Showing results 1 - 8 of 8.
Show
results per page.
Order by:
Available Now:
Technologies
Featured Projects
Topics
Data Type
Utah FORGE GeoThermOPTIMAL Video
This is a project description video by Dr. William W. Fleckenstein related to their "Development of Multi-Stage Fracturing System and Wellbore Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores" R&D project at Utah FORGE which is linked...
Fleckenstein, W. Colorado School of Mines
Dec 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Utah FORGE: Phase 1a Tensor Strainmeter Data for the April, 2022 Stimulation of Well 16A(78)-32
Data from two Tensor Optical Fiber Strainmeters that were operational during Stages 1, 2, and 3 of the April, 2022 stimulation of well 16A(78)-32. Each csv file contains data from each stimulation stage (stage1, stage2, stage3) for both Phase 1a strainmeter installations (FS01, f...
DeWolf, S. and Murdoch, L. Clemson University
Sep 15, 2022
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Utah FORGE Well 16A(78)-32 Stage 1 Pressure Falloff Analysis
This is an analysis of the pressure falloff in stage 1 fracture stimulation of FORGE well 16A(78)-32. The objective of this research is to understand the information content of the well stimulation data of FORGE Well 16A(78)-32. The Stage 1 step-rate test, a variant of the classic...
Kazemi, H. et al Colorado School of Mines
Aug 04, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Utah FORGE: Development of Multi-Stage Fracturing System and Wellbore Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores
This paper discusses the progress on a project funded by the DOE Utah FORGE (Frontier Observatory for Research in Geothermal Energy) for the development of a subsurface heat exchanger for Enhanced Geothermal Systems (EGS) using unique casing sleeves cemented in place and are used ...
Fleckenstein, W. et al Colorado School of Mines
Oct 05, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Utah FORGE 1-2551: Multi-Stage Fracturing System and Well Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores Workshop Presentation and Report
Included here are a presentation recording, slides, and report on the Multi-Stage Fracturing System and Well Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores project by Colorado School of Mines, presented by Dr. William W. Fleckenstei...
Fleckenstein, W. et al Colorado School of Mines
Sep 08, 2023
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Utah FORGE Well 16A(78)-32 Stimulation Data (April, 2022)
This is a set of data related to the stimulation program at Utah FORGE well 16A(78)-32 during April, 2022. This includes daily reports, 1 second Pason data, tracer data, and shear stimulation data and information including a report of an evolving prognosis for the stimulation oper...
McLennan, J. Energy and Geoscience Institute at the University of Utah
May 18, 2022
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Utah FORGE: Updated Seismic Event Catalogue from the April, 2022 Stimulation of Well 16A(78)-32
These are revised catalogs, related to the April, 2022 well 16A(78)-32 stimulation (phases 1,2, & 3), provided by Geo Energie Suisse (GES) that include additional events at the start of Stage 1 and some tidying up of some locations. These catalogs also include events for additiona...
Dyer, B. et al University of Utah Seismograph Stations
Nov 09, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011
This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communica...
Cladouhos, T. et al AltaRock Energy
May 05, 2024
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible